TEMPORARY LIVING
A modular project for the construction of a temporary building without extended foundation for use as a living unit.
The aim was to create an autonomous building with TEMPORARY LIVING, which functions as a building without major requirements and meets the respective humanitarian requirements.
The uncomplicated assembly and dismantling as well as the overall transportation concept enables use at a variety of locations and on a variety of surfaces. The high-quality materials used ensure consistent quality for repeated use.
A modular system for short or long-term applications that can be adapted to the different requirements of the location and design. Additional equipment options such as a PV system, water treatment system, additional insulation etc. are already included in the basic concept.
The concept has a wide range of applications. Whether a team unit, living area, work zone or even a refugee home as well as a mobile hospital or a mobile medical station – Temporary Living enables temporary – or even long-term use for 100 people in a well thought-out and homely overall concept.
concept & use
The concept for temporary living is an arched hall that is anchored on bulk halls and filled with different types of containers to meet the wide range of requirements.
Our concept not only meets all the requirements of the building – it also solves current problems and points of conflict. The starting product is a steel truss frame in the form of an arch, which is based on a prefabricated wall construction made of flat steel sheets.
On a floor area of just under 860m2, the outer shell is converted into a living area on the inside with ready-made container systems and a coordinated room concept – so-called temporary living.
The bulk halls made of welded metal are lined up and filled with water or sand to suit the respective load situations on site. The hall floor is laid using heavy-duty elements and adapted to the height situation on site.
Gender-segregated bathrooms and common areas with cooking areas and seating will be created in the core of the building. The inner infrastructure block also includes a central administration area and a medical zone for examinations.
Benefits:
- simple foundation without high additional measures
- economic overall concept
- temporary or permanent use possible
- application area for 100 people in living areas for 6-8 people
- high level of user comfort tailored to international requirements
- all components are reusable
- short assembly times
- self-assembly by trained personnel
- delivery and interim storage in 20 ft. containers integrated in the concept
- all components are produced and manufactured in the EU
Areas of application
Refugees home 100 people
The flexible usability of Temporary Living allows an effective use as a temporary refugee shelter. Depending on the configuration, the interior can accommodate 100 individuals. The container structure includes living and dining areas, sanitation facilities, and an office area.
Factbox
- Modular arched hall B21 x 40m
- External area 870m2 , net internal usable area 646m2
- Hall volume 5,580m3
- Foundation of the long sides on 2.6m high sand-filled fill walls – no further additional measures required for the foundation
- Floor construction with heavy-duty floor structure
- 2-shell roof structure with PVC tarpaulin covering – BS2 D0 fire certification of the membrane covering
- End walls in sandwich panels
- 6 20ft transport containers integrated into the floor plan concept
- Room concept with basic furnishings
- 9 infrastructure containers in the central building area
- 28kw PV-system on the long side of the hall
- Facility technology: heating – cooling – ventilation – lighting
- 2 terminals for entrance on both sidewalls
Refugees home 116 people
The flexible usability of Temporary Living allows an effective use as a temporary refugee shelter. Depending on the configuration, the interior can accommodate 116 individuals. The container structure includes living and dining areas, sanitation facilities, and an office area.
Factbox
- Modular arched hall B21 x 40m
- External area 870m2 , net internal usable area 734m2
- Hall volume 5,580m3
- Foundation of the long sides on 2.6m high sand-filled fill walls – no further additional measures required for the foundation
- Floor construction with heavy-duty floor structure
- 2-shell roof structure with PVC tarpaulin covering – BS2 D0 fire certification of the membrane covering
- End walls in sandwich panels
- 6 20ft transport containers integrated into the floor plan concept
- Room concept with basic furnishings
- 9 infrastructure containers in the central building area
- 28kw PV-system on the long side of the hall
- Facility technology: heating – cooling – ventilation – lighting
- 2 terminals for entrance on both sidewalls
Refugees home 146 people on 2 levels
The flexible usability of Temporary Living allows an effective use as a temporary refugee shelter. Depending on the configuration, the interior can accommodate 146 individuals. The container structure includes living and dining areas, sanitation facilities, and an office area.
Factbox
- Modular arched hall B21 x 40m
- External area 870m2 , net internal usable area 866m2
- Hall volume 5,580m3
- Foundation of the long sides on 2.6m high sand-filled fill walls – no further additional measures required for the foundation
- Floor construction with heavy-duty floor structure
- 2-shell roof structure with PVC tarpaulin covering – BS2 D0 fire certification of the membrane covering
- End walls in sandwich panels
- Room concept with basic furnishings
- 8 infrastructure containers in the central building area
- 28kw PV-system on the long side of the hall
- Facility technology: heating – cooling – ventilation – lighting
- 2 terminals for entrance on both sidewalls
Health Sector / Hospitals
Temporary Living can be perfectly utilized as a first-response facility for injured individuals in war zones, during floods, or other catastrophes. With a capacity of 100 single beds and two rescue vehicles, it offers enough space for urgently needed initial medical care.
Factbox
- Modular arched hall B21 x 40m
- External area 870m2 , net internal usable area 646m2
- Hall volume 5,580m3
- Foundation of the long sides on 2.6m high sand-filled fill walls – no further additional measures required for the foundation
- Floor construction with heavy-duty floor structure
- 2-shell roof structure with PVC tarpaulin covering – BS2 D0 fire certification of the membrane covering
- End walls in sandwich panels
- 6 20ft transport containers integrated into the floor plan concept
- Room concept with basic furnishings
- 9 infrastructure containers in the central building area
- 28kw PV-system on the long side of the hall
- Facility technology: heating – cooling – ventilation – lighting
- 2 terminals for entrance on both sidewalls
Military or Security
Temporary Living also finds ideal application in the military sector, especially for temporary deployments. In this configuration, Temporary Living is equipped with sleeping containers for 100 individuals and spaces for 8 tanks, ensuring efficient and flexible utilization for military purposes.
Factbox
- Modular arched hall B21 x 40m
- External area 870m2 , net internal usable area 646m2
- Hall volume 5,580m3
- Foundation of the long sides on 2.6m high sand-filled fill walls – no further additional measures required for the foundation
- Floor construction with heavy-duty floor structure
- 2-shell roof structure with PVC tarpaulin covering – BS2 D0 fire certification of the membrane covering
- End walls in sandwich panels
- 6 20ft transport containers integrated into the floor plan concept
- Room concept with basic furnishings
- 9 infrastructure containers in the central building area
- 28kw PV-system on the long side of the hall
- Facility technology: heating – cooling – ventilation – lighting
- 2 terminals for entrance on both sidewalls
Workingspace
Temporary Living is also suitable as a versatile workspace. One half can be designed as an office, garage, or workshop, while the other half houses sleeping containers and sanitation facilities. This flexible solution allows workers to live and work on-site, enhancing efficiency and productivity.
Factbox
- Modular arched hall B21 x 40m
- External area 870m2 , net internal usable area 734m2
- Hall volume 5,580m3
- Foundation of the long sides on 2.6m high sand-filled fill walls – no further additional measures required for the foundation
- Floor construction with heavy-duty floor structure
- 2-shell roof structure with PVC tarpaulin covering – BS2 D0 fire certification of the membrane covering
- End walls in sandwich panels
- 28kw PV-system on the long side of the hall
- Facility technology: heating – cooling – ventilation – lighting
- 2 terminals for entrance on both sidewalls
Sports
Temporary Living offers versatile applications in the sports sector, even enabling eg. indoor volleyball. The central sand court, compliant with national guidelines, along with the seating area accommodating up to 200 spectators, creates ideal conditions for hosting tournaments.
Factbox
- Modular arched hall B21 x 40m
- External area 870m2 , net internal usable area 734m2
- Hall volume 5,580m3
- Foundation of the long sides on 2.6m high sand-filled fill walls – no further additional measures required for the foundation
- Floor construction with heavy-duty floor structure
- 2-shell roof structure with PVC tarpaulin covering – BS2 D0 fire certification of the membrane covering
- End walls in sandwich panels
- 28kw PV-system on the long side of the hall
- Facility technology: heating – cooling – ventilation – lighting
- 2 terminals for entrance on both sidewalls
- optional 4x4m rollerdoors on the sidewalls
Presentation area
The generous presentation area of 730 square meters provides our customers with the ideal opportunity for temporary or permanent use as a commercial property.
Factbox
- Modular arched hall B21 x 40m
- External area 870m2 , net internal usable area 646m2
- Hall volume 5,580m3
- Foundation of the long sides on 2.6m high sand-filled fill walls – no further additional measures required for the foundation
- Floor construction with heavy-duty floor structure
- 2-shell roof structure with PVC tarpaulin covering – BS2 D0 fire certification of the membrane covering
- End walls in sandwich panels
- 6 20ft transport containers integrated into the floor plan concept
- Room concept with basic furnishings
- 9 infrastructure containers in the central building area
- 28kw PV-system on the long side of the hall
- Facility technology: heating – cooling – ventilation – lighting
- 2 terminals for entrance on both sidewalls
Exhibition space
This concept offers diverse possibilities due to the flexible interior design. Moreover, it serves excellently as a concert hall, with the capability to integrate a 60m2 stage inside and provide approximately 600 seats.
Factbox
- Modular arched hall B21 x 40m
- External area 870m2 , net internal usable area 734m2
- Hall volume 5,580m3
- Foundation of the long sides on 2.6m high sand-filled fill walls – no further additional measures required for the foundation
- Floor construction with heavy-duty floor structure
- 2-shell roof structure with PVC tarpaulin covering – BS2 D0 fire certification of the membrane covering
- End walls in sandwich panels
- 28kw PV-system on the long side of the hall
- Facility technology: heating – cooling – ventilation – lighting
- 2 terminals for entrance on both sidewalls – optional 2 more on the sidewalls
- optional 4x4m rollerdoors on the sidewalls
construction
1. Straightening the surface
2. Place bulk halls
3. Fill walls with water or bulk material
4. Laying heavy-duty flooring
5. Installation of the container areas
6. Installing furniture and building services
7. Installation of steel truss frame
8. Building services connections
9. Outer shell and inner membrane